£3,000,000
Byzak Ltd
Water Treatment Works
The Top Hill Low Project was based on the Water Treatment Works. The project would involve construction of a new nitrate reduction system. Also, a new raising main system discharging into the Humber Estuary.
Furthermore, CPC Civils would install four cast in situ wet wells, valve chambers integrated into the existing water treatment works system.
200 meters of 900mm diameter ductile iron pipework would link the new and old systems together. This would include the constructed steel framed build (to house mechanical and engineering equipment used for the nitrate reduction works).