Project Value
£1.9m
Client Name
Galliford Try
Project Type
Civil Engineering
CPC Civils were responsible for the delivery of the Civils package for our client, Galliford Try. The scheme is designed to refurbish and upgrade the existing treatment works so that it will comply with the new discharge consent that comes into effect on 31st March 2020.
Construction details:
- Site investigation and enabling works,
- Construction of various reinforced concrete structures including new MBBR tank, raised inlet works foundation slab, MCC kiosk and substation foundations, pump / pipework support plinths and new hardstanding / roads,
- 4.8m deep pump station – segmental shaft constructed within a sheet pile cofferdam,
- New ducting network across site,
- New process pipework and drainage,
- New feed and outfall chambers, constructed off line and then connected to existing works when required,
- Refurbishment works inside existing low-level PS,
- Surfacing to existing access roads upon completion of works.
The new MBBR tank was built 15.2m x 15.2m x 6.8m high.